Project Name: Cherry Street Meats
Delivery Method: Design-Build
Value Engineering Savings: Approximately $45,000 – $50,000
Project Overview
Cherry Street Meats needed to replace its aging facility with a modern food-processing and cold-storage building designed to improve operational efficiency, food safety, and long-term business capacity.
The new 11,532-square-foot facility required specialized meat-cutting, freezer, cooler, smokehouse, loading, and support areas, along with high-efficiency refrigeration and coordinated building systems. The project also presented complex site conditions, including groundwater, undocumented underground utilities, and stormwater drainage constraints.
For S+B James Construction, the challenge extended beyond constructing a new building. The team needed to develop practical solutions that balanced specialized facility requirements, construction costs, site limitations, and the owner’s vision for future growth.
Challenge
The project presented several technical and site-related challenges that required careful coordination between design and construction. Specialized refrigeration and food-processing requirements demanded reliable temperature control, appropriate building systems, and durable construction solutions. The original freezer slab design incorporated a costly glycol heating system to prevent frost migration beneath the floor, while the exterior siding design presented additional constructability and cost concerns.
Unforeseen site conditions further complicated construction, including groundwater, undocumented underground utilities, existing drainage infrastructure, and stormwater routing conflicts. Changes in equipment requirements also created structural, electrical, and mechanical coordination challenges. These conditions required the team to balance operational performance, budget considerations, and construction progress while accommodating the owner’s long-term development plans.
Solution
Leveraging our team’s Design-Build expertise and previous cold-storage construction experience, S+B James collaborated with the owner, design professionals, and trade partners to develop cost-effective solutions that maintained the facility’s intended performance.
One of the most significant improvements involved redesigning the freezer slab assembly. Rather than installing the originally specified glycol heating system, the team proposed an alternative consisting of a six-inch concrete slab, eight inches of rigid insulation, a sand layer, and passive ventilation piping. This approach addressed frost-heave prevention requirements while eliminating the need for a more complex mechanical system, resulting in estimated savings exceeding $30,000.
The team also improved the exterior siding installation by replacing the original metal standoff and Z-channel detail with a more practical wood furring system over continuous insulation. This modification simplified installation while maintaining the design intent, generating an additional $15,000–$20,000 in estimated savings.
Throughout construction, S+B James worked collaboratively to resolve unexpected site conditions, coordinate changes to refrigeration and electrical systems, and address fire separation and building performance requirements. Flexible construction sequencing allowed work to continue in available areas while challenges were resolved.
Beyond the primary facility, the team coordinated additional utility infrastructure for six residential lots behind the building, supporting the owner’s future development opportunities.
Results
Through innovative value engineering and collaborative problem-solving, S+B James delivered a modern, highly functional food-processing facility while identifying approximately $45,000–$50,000 in construction cost savings.
The completed building provides improved production areas, specialized refrigeration and cold-storage spaces, efficient loading operations, and building systems tailored to Cherry Street Meats’ daily operations. The team’s ability to adapt to unforeseen site conditions, coordinate complex building systems, and refine construction details helped maintain project progress while preserving the owner’s operational goals.
Benefit to Owner
Cherry Street Meats gained more than a replacement facility. The Design-Build approach provided opportunities to reduce upfront construction costs, simplify building systems, and create an environment better suited to the company’s long-term operations.
The alternative freezer slab design reduced mechanical complexity and associated maintenance needs, while improvements to the exterior building assembly provided additional cost savings. Updated production and cold-storage areas support a cleaner, safer, and more efficient operation.
Additionally, infrastructure improvements for the six adjacent residential lots enhanced the property’s potential for future development or sale, extending the value of the project beyond the new facility.
By combining design coordination, construction expertise, and owner-focused problem-solving, S+B James delivered measurable savings and long-term value while helping Cherry Street Meats position its business for continued growth.