California Middle School Campus Renewal
This comprehensive campus renewal project focuses on aesthetic enhancements, cosmetic maintenance, and essential utility and systems upgrades to revitalize the campus while ensuring compliance and functionality.
Key scope elements include:
- Interior Upgrades: Replacement of floor coverings and new paint throughout campus buildings, as well as electrical improvements, including the replacement of electrical switchgear and upgrades to low-voltage and fire alarm systems across three buildings.
- Site Enhancements: Restored grass in the west playfield, installation of an electronic marquee at the street, and significant hardscape replacements to ensure a compliant path of travel throughout the campus.
- Accessibility Improvements: Reconfiguration of ADA accessibility in Parking Lot 01 and upgrades to landscaping, grass, and irrigation systems.
- Fencing and Security: Refurbishment and replacement of perimeter fencing and gates, including the installation of one-way motorized access gates for Staff Parking Lot 02.
This project reflects a thoughtful approach to modernization, blending aesthetic improvements with critical infrastructure upgrades to enhance the campus environment for students, staff, and visitors alike.
Client: Sacramento City Unified School District