Stantec Architecture
July 01, 2020
Heman was instrumental in guiding the team to successfully address the project challenges. He maintained a schedule where the client required several intermittent design reviews while construction remained active. It was the processes and protocols such as pull plans and action plans, that he introduced and implemented from the inception of design that created a structure of rigor and accountability in the team from day one, and continued through the life of the project.”